0 0
LIMIT OF WORKS SITE
TIE TO NEW TERRITORIES
CIRCULAR ROAD
(REFER AUTHORIZED PLAN & SCHEME
VIDE GN 3733 OF 1983) /
綳撕界環想公證計劃連續
MADLIB*9.
-TERTAINER
ос
#1 RA
LIMIT OF WORKS SITE
W
FAIRVIEW
PROPOSED OROD BY WA! TSAI
BORROW
AREA
BEVERLEY GARDEN $3.0
000
100
0000000
CUT SLOPE TO BE HYDROSEEDED
AND LANDSCAPED Ț-
HKMAC L
WAI TSAI BORROW AREA
DGKAL
LIMIT OF WORKS SITE
新田
SAN TIN
NOTES:
1. ALL LEVELS ARE IN METRES ABOVE
PRINCIPAL DATUM HONG KONG.
*****£6 LKPL PAL
KEY MAP 索引圈
SCALE 20000
LEGEND:
EXISTING STRUCTURES TO BE DEMOLISHED MVGWARA¤ SM
PROPOSED SLOPE CONTOUR
85%
LIMIT OF WORKS AREA *IER
"ON ANY PRORFUSED B/GMC FICATION ADDED
A 16/06. General revision.
по
7
REVISION
desprun
Jate
sureyed
designed
CHEN
3/85
D
traced
LAU
3/86
checked
3/7/20
approved
OBJECTION NG B
MR. WONG-KAI - CH 8 MR. WONG YAT - MING
MODIFICATION “
NO MODIFICATION POSSIBLE
REGIONAL HIGHWAY ENGINEERINT.
PW.P. item no. 172 TH
contract le 12 M
NEW TERRITORIES CIRCULAR ROAD IMPROVEMENTS
AU TAU TO FAN KAM ROAD
PHASE 3-FAIRVIEW PARK TO MAI PO *4*49 17 3 1.4
[ #0] – 04 ** TELEG
unawing title
!
ROADS (WORKS, USE AND COMPENSATION)
ORDINANCE (CHAPTER 370) BORROW AREA **(* 12ERSEN (16MbALBA) - KAB
ase be
drawing noc
NH 6154B 1:1000
Binnie & Partners (Hong Kong) Wilbur Smith & Associates
Harris & Sutherland (Far East)
allum
ink k
(##)
HIGHWAYS IN.T. REGION
田
HIGHWAYS
DEPARTMENT
路
政
HỒNG KÔNG Ệ
No comments yet.