0 0

LIMIT OF WORKS SITE

TIE TO NEW TERRITORIES

CIRCULAR ROAD

(REFER AUTHORIZED PLAN & SCHEME

VIDE GN 3733 OF 1983) /

綳撕界環想公證計劃連續

MADLIB*9.

-TERTAINER

ос

#1 RA

LIMIT OF WORKS SITE

W

FAIRVIEW

PROPOSED OROD BY WA! TSAI

BORROW

AREA

BEVERLEY GARDEN $3.0

000

100

0000000

CUT SLOPE TO BE HYDROSEEDED

AND LANDSCAPED Ț-

HKMAC L

WAI TSAI BORROW AREA

DGKAL

LIMIT OF WORKS SITE

新田

SAN TIN

NOTES:

1. ALL LEVELS ARE IN METRES ABOVE

PRINCIPAL DATUM HONG KONG.

*****£6 LKPL PAL

KEY MAP 索引圈

SCALE 20000

LEGEND:

EXISTING STRUCTURES TO BE DEMOLISHED MVGWARA¤ SM

PROPOSED SLOPE CONTOUR

85%

LIMIT OF WORKS AREA *IER

"ON ANY PRORFUSED B/GMC FICATION ADDED

A 16/06. General revision.

по

7

REVISION

desprun

Jate

sureyed

designed

CHEN

3/85

D

traced

LAU

3/86

checked

3/7/20

approved

OBJECTION NG B

MR. WONG-KAI - CH 8 MR. WONG YAT - MING

MODIFICATION “

NO MODIFICATION POSSIBLE

REGIONAL HIGHWAY ENGINEERINT.

PW.P. item no. 172 TH

contract le 12 M

NEW TERRITORIES CIRCULAR ROAD IMPROVEMENTS

AU TAU TO FAN KAM ROAD

PHASE 3-FAIRVIEW PARK TO MAI PO *4*49 17 3 1.4

[ #0] – 04 ** TELEG

unawing title

!

ROADS (WORKS, USE AND COMPENSATION)

ORDINANCE (CHAPTER 370) BORROW AREA **(* 12ERSEN (16MbALBA) - KAB

ase be

drawing noc

NH 6154B 1:1000

Binnie & Partners (Hong Kong) Wilbur Smith & Associates

Harris & Sutherland (Far East)

allum

ink k

(##)

HIGHWAYS IN.T. REGION

HIGHWAYS

DEPARTMENT

HỒNG KÔNG Ệ

Share This Page