Project

cost

$m

5.666

Funds needed

in 1982-83 $m

0.567

(i)

(ii)

Grade Separated Access

To provide a flyover to the University campus arising from the widening of Pokfulam Road in 1984-85. The $5.666mrepre-

sents only half of the cost

of the project as it has been agreed that the total cost

would be shared equally between the University and the Public

Works Department.

Conversion/Extension to Redmond

Building

To construct two marine

laboratories on the ground and

first floors when the area is

vacated on completion of

Phase Ia buildings.

(iii) Air-conditioning of Flora Ho

4.3 1.

5.099

0.567

Sports Centre

2.000

2.000

To enable examinations to be

held in the Centre which is

now under construction.

(iv)

Lease Condition Requirements

6.572

1.700

(+)

Central Dangerous Goods Store

The former stores were demolished to make way for

1.303

0.170

:

the development of Phase 1a, and dangerous goods are at

present stored in a temporary small structure near the Chemistry Building

CONFIDENTIAL

20.640

===

5.004

Chinese