CONFIDENTIAL ##
機密
8
Total
Project
cost
$m
5.666
Funds needed
in 1982-83 $m
0.567
(i)
(ii)
Grade Separated Access
To provide a flyover to the University campus arising from the widening of Pokfulam Road in 1984-85. The $5.666mrepre-
sents only half of the cost
of the project as it has been agreed that the total cost
would be shared equally between the University and the Public
Works Department.
Conversion/Extension to Redmond
Building
To construct two marine
laboratories on the ground and
first floors when the area is
vacated on completion of
Phase Ia buildings.
(iii) Air-conditioning of Flora Ho
4.3 1.
5.099
0.567
Sports Centre
2.000
2.000
To enable examinations to be
held in the Centre which is
now under construction.
(iv)
Lease Condition Requirements
6.572
1.700
(+)
Central Dangerous Goods Store
The former stores were demolished to make way for
1.303
0.170
:
the development of Phase 1a, and dangerous goods are at
present stored in a temporary small structure near the Chemistry Building
CONFIDENTIAL
20.640
===
5.004
Chinese
機密
:
4
i.
!