BUILDING (REFUSE CHUTES) REGULATIONS, 1959.

ARRANGEMENT OF REGULATIONS.

Regulation.

1.

Citation and commencement

÷

444

1.

Interpretation

---

F

1

Refuse chute to be vertical, etc. ...

No bends or offsets in any refuse chute

Arh

+++

+יי

E

Page.

1

2

N

5.

Lining and Internal size of refuse chute

6.

Walk

ДИЙ

word

7.

Refuse chute to be provided with shutter

3

B.

Ventilating pipe for refuse chule

9.

Inspection and cleansing of refuse chute

+++

+

3

3

30.

Construction of internal surface of refuse chute

11.

Situation of hopper

12.

Construction of hoppers

13.

Hopper recess

***

་་་

***

***

+++

1

4

14.

Junction of hopper with chute

15.

Access to container chamber for emptying refuse containers

4

16.

Container chamber to be fully cuclosed save for door, etc,

17.

Container chamber to have one external wall

18.

Size of container chamber

19.

Construction of container chamber

www

J

20.

Access door to container chamber and construction thereof

21.

Drainage of container chamber

www

$

***

Container chamber to have water supply print

իեւ:

1.

Prescribed period for purposes of section 26A of the Ordinance

114

Share This Page