Q 95
P.W.E. Hongkong.
(o) Kennedy Road Improvements.-This was referred to in paragraph 120 (r.) of last year's Report. A further section of the road between Macdonnell Road and Monmouth Path was widened and formed to a minimum width of 25 feet.
1924 Estimates, $10,000.00
1924 Expenditure, $9,839.82
(p.) Road Improvements and widenings, Bonham Road.—This work was referred to in paragraph 120 (s.) (i.) of last year's Report. The widening of a further section adjoining I.L. 590 was put in hand and completed.
1924 Estimates, $20,000.00
1924 Expenditure, $19,939.15
(q.) Main Roads in City,—Surfacing with Asphaltum.—This was referred to in paragraph 120 (t.) of last year's Report.
Connaught Road Central between Gilman and Hillier Streets and between Pottinger and Jubilee Streets was surfaced half the width on the Southern side with asphaltic sand carpeting 2" thick laid on cement concrete foundation 6″ thick, and on the Northern side with granite setts on cement concrete foundation 6" thick.
1924 Estimates, $60,000.00
1924 Expenditure, $64,331.09
(r.) Pokfulam Road, surfacing with sand carpeting between Nos. 4-8 Bridges, and from No.11 Bridge to Aberdeen Village. This work referred to in paragraph 120 (v.) of last year's Report was continued, and the section between Pokfulam Police Station and the City Boundary was completed by the end of the year, with the exception of two small lengths where drainage work was in progress.
1924 Estimates, $30,000.00 1924 Sup. Vote, $20,000.00
$50,000.00
1924 Expenditure, $52,092.66