Mat-sheds will be erected as follows:-
For officers
For European troops
For Asiatic
Estimated time, ten days.
1
5
Engineer District.-This section is, with Sections V, VI, and VII, in B Engineer District, under the general Engineer supervision of Captain McCarthy, R.E.
Tools--The tools required are enumerated in Schedule XVIII (4), and will be issued with the camp equipment.