Page 110

Page 110

135

Mat-sheds will be erected as follows:-

For officers

For European troops

For Asiatic

Estimated time, ten days.

1

5

Engineer District.-This section is, with Sections V, VI, and VII, in B Engineer District, under the general Engineer supervision of Captain McCarthy, R.E.

Tools--The tools required are enumerated in Schedule XVIII (4), and will be issued with the camp equipment.

[658]

Page 110

2 N

65

Page 110

Page 110Page 111

Officers

Other ranks

Total

:::

Woolwich

Store

Charge.