No. of Work.
Page 52
Page 52
Table E (iii).--DISTRIBUTION of Tools and Materials for Construction of Works at the Precautionary Stage.
Section, Position, and Nature of Work.
Stonecutters Island.
Fire trenches on South Shore for 25 men
2 Strengthen barbed wire fence round South Shore
water tank
10
10
3
Fire trenches on North Shore for 25 men..
10
10
2
1
4
Enclose E.L. emplacement on North Shore with wire
fence
5
Clear trees at Central Battery to give arc of fire to
2
guns
6
Central Battery: Strengthen barbed wire fence on
north side
7
1
Pairs.
Yards.
300
2
100
2,000
7
2
1
1,000
300
2
100
1
2,000
1
50 1
1,000
영웅 영웅
580
1,320
::
:
590
1,370
Lbs.
Mauls.
Barbed Wire.
Saws, Hand.
Saws, Cross-cut.
Sledge-hammers.
Hammers.
Augurs.
Tools and Materials,
Approximate Weight.
to 39
Co
5
1 3
3
Co
2
6
5
CON N
:
Wire entanglements round E.L. emplacements,
Stonecutters generally
8 Strengthen wire fence round E. Light, Albion
9
Central Battery: P.F., enclose with wire fence
10
11
12
13
14
15
16
17
67
Enclose water supply north of married quarters,
South Shore, with wire fence
Wire for entanglements and lacing among rocks on
shore
Island Section.
Defence of Cattle Pier, Kennedy Town
Entanglements round E.L. emplacement, Praya Barbed wire entanglement round new magazine Barbed wire entanglement round old magazine Position at Sandy Bay Gap for one company, with
entanglements
Clearing in front of above
Preparation of sites for 2-15-pr. guns near Wong-
nei-cheong and south of Mount Nicholson
:
00 00
1
:
::::2
::
3:5
50
10
50
:2
::
2
ลล
2
20
:
20
1
1
2,000
350
3 500
1
3,000
4,500
1
1
1,000
180
50 1
1,000
580
120
2,500
1,380
4,100
160,000
•
58,300
Remarks,
60
10880
5
6
300
***
3
25
3
50
20 1,350
10
20 900 10
3 100
22004
600 1,000
520
900
27,000
15,500
18,000
9,400
2,000
1,800
20
20
70
200
::
160
1388
30
30 60
10 8
42
Page 52
Page 52
1
51
CHAPTER III (E).
33
Page 52
No comments yet.
Private notes are available after approval.