CAB11-57-15 — Page 53

National Archives 英國國家檔案館 All

Page 53

Page 53

No. of Work.

Table E (iii).----DISTRIBUTION of Tools and Materials for Construction of Works at the Precautionary Stage-continued.

Tools and Materials.

Section, Position, and Nature of Work.

Lbs.

Crowbars.

Axes, Felling.

Axes, Hand,

Bill-hooks.

Gloves, Hedging.

Sand-bags.

Pliers.

Pickets.

Mauls.

Barbed Wire.

Saws, Hand.

Saws, Cross-cut.

Sledge-hammers.

Hammers.

Augurs.

Approximate Weight.

Picks.

Shovels.

:::::

::

2

Pairs.

Yards.

1,000

2

2

2

1,000

::

0.009

2,000

::

1,000

270

25

5

2,000

10

360

5

8

100

3

100

10

20

200

6

300

30

1,000 10

150

~ * ~ 40 10 -

2

4,500

4

6,000

2

2,000

3

6,000

5

3,000

6

100

2

50

1

2,000

4

6

282:

10

500 6

300

3

6,000

20

1,000

10

150

5

3,000

20

1,000

10

300

5

6,000

100

200

::

Island Section-continued.

18

Fire trenches at Taitam

50 50

19

Putting in a state of defence the cable landing place | 30

at Taiwan Bay

30

303

~ 21

2

21

23

2228*2 88 8

20

Fire trenches at Wong-nei-cheong

Savall redoubt and defences generally at Aberdeen

22 Fire trenches at Mount Kellet

Fire trenches at Sanitarium

20

24

Fire trenches at Kellett Bay

25

Putting in a state of defence the cable landing place

at Deepwater Bay

26

Fire trenches at Deepwater Bay..

27

Fire trenches at Repulse Bay

28

Fire trenches at Stanley

29

30

$1

32

Improve existing path from Boa Vista to Quarry

Gap into a gun road

33

Approach road and preparation of position for 2-18-pr. guns near Saiwan Redoubt and fire trenches

Preparation of site and approach road for 2-18-prs. 20

on west slopes of Pottinger Peak (height 1,120 feet) Preparation of site and approach road for 2-18-prs.| 20

on knoll south-east of Tytam Gap and at Boa Vista Road from Tytam Gap to infantry position on Mount

Collinson

8582 8888 8

20 20

2

50 50

25

30

50

50

4

2

30

30

50 50

50

50

20

2222

20

20

20

:

*

:

3

300

:

Remarks,

CHAPTER III (E),

52

560

1,690

3,350

3,360

1,140

3,850

2,300

820

3,880

2,850

4,250

250

2,300 yards of road by

contract.

160

::

::::::

:

:

34

35

Improve existing trenches and 15-pr. position, Boa

Vista

Road from Pottinger Gap to Mount Collinson and

Cape Collinson

:

:

6

5

1

2

8

200

4

100 2

2,000

36

Construction of road to site for emplacements for

2--5-in, howitzers on Mount Violet

2

4

8

100

2 100

2

2,000

·

100 yards of road--by

contract.

Contract.

Contract.

190 Road by contract.

:

:

:

*

:

:

.

::

:

:

:

38

37 Infantry post and entanglements on Mount Collinson 10 Infantry trenches at Tytam Tuk, covering telephone 12

post with entanglements

10

1

12

1

2

::

2

5

200

2

110 1 2,200

4

12

100 3 170 1 3,500

39

Infantry trench, clearing, and entanglements on 10

Pottinger Peak

10

1

2

4 20

500 2 100 1 2,000

1,000

20,000

40

D'Aguilar Wireless Station, entanglements round, 10

and fire trench to command landing, and placing installation in a state of defence

10

2

1

2 10

1,500

2 100

1 2,000

41

Barbed wire fence across land north of Cable Hut,

Devil's Peak

*

5

2 300 1

6,000

[885]

Eastern Fire Command.

Contract.

1,300

1,200

::

:

:

1,420

2,110

1,400 11,200

1,550

3,400

::::

::::

::

700 | Additional

wire

for

fencing along shore of Saiwan Bay-30,000.

3,400

1,180

3,400

3,500

2,160

650

500

800

400

2

*

200

1

100

4 225

2 4,500

::

::

*

400

150

I 2

2,900

100 4 225 2 4,500 100 4 225 2 4,500

300 10 825 5 13,500

2

2,900

1

2

2,900

1 4

7,800

100

5 225 2 4,500

2,900

100 1 225 2

4,000

2,900

200

5 450 2

9,000

5,500

42

Maxim emplacement, fire trench, and entanglement 5

at Saiwan Bay

2

2

50 |

1

50 1: 1,000

44

Fire trenches commanding Lyemun Bay

45

46

47

48

49

50

43 Entanglement of existing double fence, Saiwan

Battery and P.F. Cell

1

Enclose E. Lights with high wire entanglements High wire entanglement round Pak-sha-wan Battery High wire entanglement round Brennan directing station down east side of path to torpedo installation Entanglements in existing fence round Gough Battery

and P.F. Cell

Entanglements in existing fence round F.C. Post

Entanglements in existing fence round Pottinger

Battery and P.F.

Mainland Section.

Emplacements for 2---15-prs. and 2-2-95-in. guns: 25 25

5

5

300 1

6,000

5

5

50

100

:

2,000

8

300 4 6,000

300

4 6,000

::

6

2

6

1

6

4 200 2 8,000

4,000

3,000

5,000

Chin-lan-chu Bridge

Customs Hill

Customs Pass

51

4

at Chin-lan-chu

52

Emplacements for 1-5-in, howitzer at Customs Pass

8

8 2

53

Fire trenches and blockhouses at--

Devil's Peak

25

25 2

Haiwan..

Lan-tong

Chin-lan-chu

25 25

25 25

50 50

25 25

28 28

WON ON 20 N OI OI

.

:

25 25

~~2 N N N N

6

6

පලස ස ස

54

Road, Kowloon City to Shatin Pass

55

Road, Shating Pass to Crown Point

56

Emplacements for a 4.7-in, and 2-2′95-in. guns at

Tate's Cairn

30 30 4 4

10

400

57

Emplacements for 2-5-in. howitzers at Crown Point 20

30 4 4

10

200

P

Page 53

Page 53

53

Contractor's tools.

Ditto.

500

310

CHAPTER III (E).

34

Page 53

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.