No. of Work.

Nature of Works.

61

MAINLAND SECTION-Contd.

Fire trenches and six blockhouses at-

Kowloon Pass

Railway Pass

··

Beacon Hill Pass

1009 Hill

Page 51

Table E (ii).-DETAIL of Works to be constructed on Mobilization-continued.

Detail of Working | R.E. Super-

Parties.

vision.

Tools Required.

Officers.

N.C.Os.

and Men.

Pickaxes.

200

and Men.

Coolies.

Officers.

N.C.Os.

:

Shovels.

Crowbars.

Axes.

Bill-hooks.

Sand-bags.

Pliers.

Mauls.

Time Required.

Barbed Wire.

Remarks.

1020 Hill

Shan Si

Near dam

Pipers' Hill

Lai-chi-kok

Building Wong-Uk in state of defence

Wire entanglements, 1,650 yards run

Total required for all Sub-Sections (4).. Ditto, plain

Pickets

:

:

200

200 20 20 40 500

:

::

:

:

:

2 days

:

89,100

307,500

11,400

10,000

NOTE 1.-The number of items to be carried out being largely in excess of available working parties, the tools laid down in Table E (iii) are those considered sufficient for all probable working

parties, infantry bringing with them their regimental establishment of tools. 2.-For contract work, contractors find their own tools.

"

19

""

3.-Pending supply of steel pickets, dormant contracts have been made for 20,000 hardwood pickets to be supplied in three days. There are 4,500 such available in R.E. store. 4.-Arrangements have been made for obtaining such water tanks and barrels as may be needed for storage at short notice.

The plans, &c., relating to the above Table, where needed, were last examined and compared with the Defence Scheme on

>

190.

Page 51

Page 51

50

CHAPTER III (E).

Page 51

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.