No. of Work.

Nature of Works.

61

MAINLAND SECTION-Contd.

Fire trenches and six blockhouses at-

Kowloon Pass

Railway Pass

··

Beacon Hill Pass

1009 Hill

Page 51

Table E (ii).-DETAIL of Works to be constructed on Mobilization-continued.

Detail of Working | R.E. Super-

Parties.

vision.

Tools Required.

Officers.

N.C.Os.

and Men.

Pickaxes.

200

and Men.

Coolies.

Officers.

N.C.Os.

:

Shovels.

Crowbars.

Axes.

Bill-hooks.

Sand-bags.

Pliers.

Mauls.

Time Required.

Barbed Wire.

Remarks.

1020 Hill

Shan Si

Near dam

Pipers' Hill

Lai-chi-kok

Building Wong-Uk in state of defence

Wire entanglements, 1,650 yards run

Total required for all Sub-Sections (4).. Ditto, plain

Pickets

:

:

200

200 20 20 40 500

:

::

:

:

:

2 days

:

89,100

307,500

11,400

10,000

NOTE 1.-The number of items to be carried out being largely in excess of available working parties, the tools laid down in Table E (iii) are those considered sufficient for all probable working

parties, infantry bringing with them their regimental establishment of tools. 2.-For contract work, contractors find their own tools.

"

19

""

3.-Pending supply of steel pickets, dormant contracts have been made for 20,000 hardwood pickets to be supplied in three days. There are 4,500 such available in R.E. store. 4.-Arrangements have been made for obtaining such water tanks and barrels as may be needed for storage at short notice.

The plans, &c., relating to the above Table, where needed, were last examined and compared with the Defence Scheme on

>

190.