1974-1975 — Page 97

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Committee

Automobile Repairs and Servicing

Industrial Committee

Electrical Apparatus and Appliances

Industrial Committee

Vehicle Allocation Committee

Representative(s)

Principal Government Electrical &

Mechanical Engineer

a Chief Engineer

a Chief Engineer

Advisory Committee for the Department

a Chief Engineer

of Mechanical and Marine Engineering of the Hong Kong Polytechnic

Committee on Apprenticeship

a Chief Engineer

Machine Shop and Metal Working

Industry Committee

a Chief Engineer

P.W.D. Metrication Committee

a Senior Engineer

Air Cargo Complex Co-ordinating Committee

Defence Works Programme Committee

a Senior Engineer

a Senior Engineer

8.05

DESIGN AND PROJECTS DIVISION

Chief Electrical and Mechanical Engineer:

W.J. HAMPTON, C.Eng., M.I.E.E.

This Division is responsible for all new projects, both Electrical and Mechanical, which are undertaken on behalf of client Departments and the various Offices of the Public Works Department. In addition to acting as consultants, the duties of the Division include the investigation, design, preparation of specifications, drawings, indents and contract documents for, as well as the supervision of, projects under construction. The Division also administers the Lifts and Escalators (Safety) Ordinance.

New Projects Completed

8.06

During the year 37 projects were completed at an estimated total cost of $4 million. These included the installation of steam and fuel oil services, emergency generators, laundry equipment, pumps for fire-fighting, flushing and fresh water services, lighting and pumping equipment in pedestrian subways, air compressors, refuse incinerators, electrical hoists and electrical installations.

Design

8.07

Preliminary investigation, design work, preparation of specifications and detailed drawings for 25 projects were completed while similar work on 13 other projects was in hand at the end of the year.

83

Edit History

2026-05-12 06:22:51 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Committee Automobile Repairs and Servicing Industrial Committee Electrical Apparatus and Appliances Industrial Committee Vehicle Allocation Committee Representative(s) Principal Government Electrical & Mechanical Engineer a Chief Engineer a Chief Engineer Advisory Committee for the Department a Chief Engineer of Mechanical and Marine Engineering of the Hong Kong Polytechnic Committee on Apprenticeship a Chief Engineer Machine Shop and Metal Working Industry Committee a Chief Engineer P.W.D. Metrication Committee a Senior Engineer Air Cargo Complex Co-ordinating Committee Defence Works Programme Committee a Senior Engineer a Senior Engineer 8.05 DESIGN AND PROJECTS DIVISION Chief Electrical and Mechanical Engineer: W.J. HAMPTON, C.Eng., M.I.E.E. This Division is responsible for all new projects, both Electrical and Mechanical, which are undertaken on behalf of client Departments and the various Offices of the Public Works Department. In addition to acting as consultants, the duties of the Division include the investigation, design, preparation of specifications, drawings, indents and contract documents for, as well as the supervision of, projects under construction. The Division also administers the Lifts and Escalators (Safety) Ordinance. New Projects Completed 8.06 During the year 37 projects were completed at an estimated total cost of $4 million. These included the installation of steam and fuel oil services, emergency generators, laundry equipment, pumps for fire-fighting, flushing and fresh water services, lighting and pumping equipment in pedestrian subways, air compressors, refuse incinerators, electrical hoists and electrical installations. Design 8.07 Preliminary investigation, design work, preparation of specifications and detailed drawings for 25 projects were completed while similar work on 13 other projects was in hand at the end of the year. 83
Baseline (Original)
Committee Automobile Repairs and Servicing Industrial Committee Electrical Apparatus and Appliances Industrial Committee Vehicle Allocation Committee Representative(s) Principal Government Electrical & Mechanical Engineer a Chief Engineer a Chief Engineer Advisory Committee for the Department a Chief Engineer of Mechanical and Marine Engineering of the Hong Kong Polytechnic Committee on Apprenticeship a Chief Engineer Machine Shop and Metal Working Industry Committee a Chief Engineer P.W.D. Metrication Committee a Senior Engineer Air Cargo Complex Co-ordinating Committee Defence Works Programme Committee a Senior Engineer a Senior Engineer 8.05 DESIGN AND PROJECTS DIVISION Chief Electrical and Mechanical Engineer: W.J. HAMPTON, C.Eng., M.I.E.E. This Division is responsible for all new projects, both Electrical and Mechanical, which are undertaken on behalf of client Departments and the various Offices of the Public Works Department. In addition to acting as consultants, the duties of the Division include the investigation, design, preparation of specifications, drawings, indents and contract documents for, as well as the supervision of, projects under construction. The Division also administers the Lifts and Escalators (Safety) Ordinance. New Projects Completed 8.06 During the year 37 projects were completed at an estimated total cost of $4 million. These included the installation of steam and fuel oil services, emergency generators, laundry equipment, pumps for fire-fighting, flushing and fresh water services, lighting and pumping equipment in pedestrian subways, air compressors, refuse incinerators, electrical hoists and electrical installations. Design 8.07 Preliminary investigation, design work, preparation of specifications and detailed drawings for 25 projects were completed while similar work on 13 other projects was in hand at the end of the year. 83
2026-05-12 06:22:51 · Baseline
View content

Committee

Automobile Repairs and Servicing

Industrial Committee

Electrical Apparatus and Appliances

Industrial Committee

Vehicle Allocation Committee

Representative(s)

Principal Government Electrical &

Mechanical Engineer

a Chief Engineer

a Chief Engineer

Advisory Committee for the Department

a Chief Engineer

of Mechanical and Marine Engineering of the Hong Kong Polytechnic

Committee on Apprenticeship

a Chief Engineer

Machine Shop and Metal Working

Industry Committee

a Chief Engineer

P.W.D. Metrication Committee

a Senior Engineer

Air Cargo Complex Co-ordinating Committee

Defence Works Programme Committee

a Senior Engineer

a Senior Engineer

8.05

DESIGN AND PROJECTS DIVISION

Chief Electrical and Mechanical Engineer:

W.J. HAMPTON, C.Eng., M.I.E.E.

This Division is responsible for all new projects, both Electrical and Mechanical, which are undertaken on behalf of client Departments and the various Offices of the Public Works Department. In addition to acting as consultants, the duties of the Division include the investigation, design, preparation of specifications, drawings, indents and contract documents for, as well as the supervision of, projects under construction. The Division also administers the Lifts and Escalators (Safety) Ordinance.

New Projects Completed

8.06

During the year 37 projects were completed at an estimated total cost of $4 million. These included the installation of steam and fuel oil services, emergency generators, laundry equipment, pumps for fire-fighting, flushing and fresh water services, lighting and pumping equipment in pedestrian subways, air compressors, refuse incinerators, electrical hoists and electrical installations.

Design

8.07

Preliminary investigation, design work, preparation of specifications and detailed drawings for 25 projects were completed while similar work on 13 other projects was in hand at the end of the year.

83

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.