206. In the Wan Chai district a 66" diameter sewer off Gloucester Road was laid with its outlet 1,200 feet out at sea. This is the second deep sea outfall to be commissioned in Hong Kong. It will go far to eliminate the nuisance of sewage discharge through seawalls. Investigations to determine the most suitable location of deep sea outfalls for the efficient dispersal and dilution of sewage were continued. Float tests were employed.

207. Intercepting sewers were constructed at Chatham and Salisbury Roads in the Kowloon South district, Kwun Tong Road in the Kwun Tong district and on the Island at Java Road and Electric Road, North Point.

208. Indents for the three screening plants for the districts of Wan Chai, Kowloon South and Kowloon East were prepared for submission to the Crown Agents.

209. Ejector pumps were installed at Shek Wu Hui and are operating satisfactorily. These 'Shone' pumps serve the newly developed portion of the town and are used to lift sewage to a small treatment plant prior to the discharge of resultant effluent into a nearby stream-course.

PRIVATE WORKS

210. 1,419 proposals for private drainage works were examined and advice was given on a further 622 schemes relating to sales of Crown lands—increases of 157 and 134 respectively on totals for the previous year.

ELECTRICAL AND MECHANICAL OFFICE

Chief Electrical & Mechanical Engineer, D. W. WALKER, B.Sc., A.M.I.E.E., M.I.Mech.E.

GENERAL

211. This sub-department with a staff of 1,479 is responsible for the design, specification, installation (either by direct labour or contract), repair and maintenance of most Government electrical and mechanical plant, equipment and road vehicles.

TRANSPORT SECTION

212. The transport section was responsible for running a transport pool of 169 vehicles.

213. 342 applicants were tested as motor drivers and of these 225 were engaged.

38

Edit History

2026-05-11 20:54:50 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
206. In the Wan Chai district a 66" diameter sewer off Gloucester Road was laid with its outlet 1,200 feet out at sea. This is the second deep sea outfall to be commissioned in Hong Kong. It will go far to eliminate the nuisance of sewage discharge through seawalls. Investigations to determine the most suitable location of deep sea outfalls for the efficient dispersal and dilution of sewage were continued. Float tests were employed. 207. Intercepting sewers were constructed at Chatham and Salisbury Roads in the Kowloon South district, Kwun Tong Road in the Kwun Tong district and on the Island at Java Road and Electric Road, North Point. 208. Indents for the three screening plants for the districts of Wan Chai, Kowloon South and Kowloon East were prepared for submission to the Crown Agents. 209. Ejector pumps were installed at Shek Wu Hui and are operating satisfactorily. These 'Shone' pumps serve the newly developed portion of the town and are used to lift sewage to a small treatment plant prior to the discharge of resultant effluent into a nearby stream-course. PRIVATE WORKS 210. 1,419 proposals for private drainage works were examined and advice was given on a further 622 schemes relating to sales of Crown lands—increases of 157 and 134 respectively on totals for the previous year. ELECTRICAL AND MECHANICAL OFFICE Chief Electrical & Mechanical Engineer, D. W. WALKER, B.Sc., A.M.I.E.E., M.I.Mech.E. GENERAL 211. This sub-department with a staff of 1,479 is responsible for the design, specification, installation (either by direct labour or contract), repair and maintenance of most Government electrical and mechanical plant, equipment and road vehicles. TRANSPORT SECTION 212. The transport section was responsible for running a transport pool of 169 vehicles. 213. 342 applicants were tested as motor drivers and of these 225 were engaged. 38
Baseline (Original)
206. In the Wan Chai district a 66" diameter sewer off Gloucester Road was laid with its outlet 1,200 feet out at sea. This is the second deep sea outfall to be commissioned in Hong Kong. It will go far to eliminate the nuisance of sewage discharge through seawalls. Investiga- tions to determine the most suitable location of deep sea outfalls for the efficient dispersal and dilution of sewage were continued. Float tests were employed. 207. Intercepting sewers were constructed at Chatham and Salisbury Roads in the Kowloon South district, Kwun Tong Road in the Kwun Tong district and on the Island at Java Road and Electric Road, North Point. 208. Indents for the three screening plants for the districts of Wan Chai, Kowloon South and Kowloon East were prepared for submission to the Crown Agents. 209. Ejector pumps were installed at Shek Wu Hui and are operat- ing satisfactorily. These 'Shone' pumps serve the newly developed portion of the town and are used to lift sewage to a small treatment plant prior to the discharge of resultant effluent into a nearby stream- course. PRIVATE WORKS 210. 1,419 proposals for private drainage works were examined and advice was given on a further 622 schemes relating to sales of Crown lands--increases of 157 and 134 respectively on totals for the previous year. ELECTRICAL AND MECHANICAL OFFICE Chief Electrical & Mechanical Engineer, D. W. WALKER, B.Sc., A.M.I.E.E., M.I.Mech.E. GENERAL 211. This sub-department with a staff of 1,479 is responsible for the design, specification, installation (either by direct labour or contract), repair and maintenance of most Government electrical and mechanical plant, equipment and road vehicles. TRANSPORT SECTION 212. The transport section was responsible for running a transport pool of 169 vehicles. 213. 342 applicants were tested as motor drivers and of these 225 were engaged. 38
2026-05-11 20:54:50 · Baseline
View content

206. In the Wan Chai district a 66" diameter sewer off Gloucester Road was laid with its outlet 1,200 feet out at sea. This is the second deep sea outfall to be commissioned in Hong Kong. It will go far to eliminate the nuisance of sewage discharge through seawalls. Investiga- tions to determine the most suitable location of deep sea outfalls for the efficient dispersal and dilution of sewage were continued. Float tests were employed.

207. Intercepting sewers were constructed at Chatham and Salisbury Roads in the Kowloon South district, Kwun Tong Road in the Kwun Tong district and on the Island at Java Road and Electric Road, North Point.

208. Indents for the three screening plants for the districts of Wan Chai, Kowloon South and Kowloon East were prepared for submission to the Crown Agents.

209. Ejector pumps were installed at Shek Wu Hui and are operat- ing satisfactorily. These 'Shone' pumps serve the newly developed portion of the town and are used to lift sewage to a small treatment plant prior to the discharge of resultant effluent into a nearby stream-

course.

PRIVATE WORKS

210. 1,419 proposals for private drainage works were examined and advice was given on a further 622 schemes relating to sales of Crown lands--increases of 157 and 134 respectively on totals for the previous

year.

ELECTRICAL AND MECHANICAL OFFICE

Chief Electrical & Mechanical Engineer, D. W. WALKER, B.Sc., A.M.I.E.E., M.I.Mech.E.

GENERAL

211. This sub-department with a staff of 1,479 is responsible for the design, specification, installation (either by direct labour or contract), repair and maintenance of most Government electrical and mechanical plant, equipment and road vehicles.

TRANSPORT SECTION

212. The transport section was responsible for running a transport pool of 169 vehicles.

213. 342 applicants were tested as motor drivers and of these 225 were engaged.