(b) During curfew

(ii)

(c) General

(i)

(ii)

in addition, it will almost certainly be necessary to carry out other changes to the supply; turncocks will operate in parties and as far as possible will travel in vehicles;

additional curfew passes will be required for turncocks etc;

all non-essential staff may have to be put on a standby duty roster in case

insufficient casual workers report for duty.

ADMINISTRATION

Staff

11.

Staff at Depots include Engineers, Inspectors, Works Supervisors, Artisans, Turncocks and Drivers to control distribution and effect emergency repairs. Operational staff are posted to all major treatment works, pumping stations and reservoirs to maintain supplies.

Equipment and Stores

12.

The Director of Water Supplies is responsible for maintaining adequate stocks of stores to permit rapid repair of damaged mains etc. and all consumable stores to permit continuous operation of treatment works and pumping stations. All such stations hold emergency stocks of fuel and chemicals. Limited stocks of pipe fittings are held at Waterworks depots and the remainder are obtainable from Government Supplies.