9.

The

Expressway is being designed in detail. The first

contract for the Tai Ho Section is scheduled to start in

early 1992.

Lantau Fixed Crossing

10. The Lantau Fixed Crossing will be a road and rail

crossing from Lantau Island across Ma Wan to Tsing Yi. It will consist of two large high-level bridge structures

Tsing Ma Bridge and Кар Shui Mun Bridge linked by a

high-level viaduct across Ma Wan Island.

The bridge

structure will carry an upper six-lane expressway and a lower deck with a high-speed rail link and two lanes for

vehicles. The

scope of the project will also include a

toll plaza and approach road on Lantau and an interchange

with Route 3 on Tsing Yi.

completed.

11. The Lantau Fixed Crossing will be completed before the

new airport opens. Prequalification of tenderers has been

Detailed design for the Tsing Ma Bridge and

tender documents for both major bridges are substantially completed for tendering in August 1991. Detailed design of the remaining parts of the link will also start shortly.

Route 3 (Tsing Yi and Kwai Chung Sectors)

serve as an

airport.

12. Route 3 is an important north-south transport link which will be required with or without the new airport. The Tsing Yi and Kwai Chung sector will connect the Lantau Fixed Crossing with the West Kowloon Expressway and will important part of the road system for the new Tsing Yi section consists of a dual 3-lane

kilometres long on North-West Tsing Yi,

of bored tunnels across Tsing Yi and a

kilometre bridge crossing the Rambler Channel. The

Chung Section consists of 4 kilometres of dual 3 and 4 lane highway leading up to Lai Chi Kok.

The

carriageway 3.3

1.6 kilometres

0.5