FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

2

-

4.

are

six

At present,

preparing two

alternatives)

the PAA's Airport Master Plan Consultants terminal layout concepts (selected from for the Authority to choose from towards

the end of July for further design.

be completed soon and invited to submit bids by

5. In the meantime, design and tender documents for the

site preparation contract will

prequalified tenderers will be November this year.

<

Tung Chung Development phase 1

6.

space,

The new town at Tung Chung will have 20 000 residents

by the time the airport opens in 1997. Housing, open institutional, community and government facilities

will be provided. A sewage treatment works will be built

at Siu Ho Wan and a refuse transfer station at Sham Shui

Kok. Depending on the scale of business and industrial

airport island, the new town may also

development on the

provide land for such activities.

7.

Overall studies of the development of North Lantau are being undertaken simultaneously with the detailed design of critical works such as the formation of sites for housing,

sewage treatment works and refuse transfer station, So

that the first contracts can. be let in late 1991/early

1992.

North Lantau Expressway

8.

The North Lantau Expressway will be a dual three-lane

expressway, about 13.5 kilometres in length, with four

grade separated interchanges which will connect the new

airport and Tung Chung newtown with the Lantau Fixed Crossing. The project will also include land formation and

structures for the twin track Airport Railway as well as a

service road which incorporates a reserve for utilities

including major watermains for Tung Chung and CLK.