about 40 ba and construction of

around 1,110 metres of seawall between Rumsey Street and Tamar to provide land for the expansion of the Central

Business Area and the Airport

Railway Terminus as well as

construction of replacement

ferry piers and air

conditioning intake

facilities.

Highways

1. Route 3 Sector between Kwai Chung and Lai Chi Kok -

construction of approx. 4 km of

a dus1 4-lane highways on

elevated strctures.

2. North Lantau Expressway, Tai Ho

Section - construction of about

6 km of a dual three-lane

highways on north Lantau,

including site formation for

the twin-track airport

railway.

Privatization Projects

3. North Lantau Expressway, Yam O Section construction of about

4 km of a dual three-lane

highways on north Lantau,

including site formation for the twin-track airport railway.

1. Route 3 Sector between Kwai

Chung and Ting Kau - possible bid package for financing, designing, constuction and operation of about 6 km of

dual-three lane roads on a

cable stayed high level bridge,

elvated structures, bored

tunnels, and a medium level bridge.

- 848 2668)

May 1991

August 1991

November 1991

March 1991

Highways Department (Mr HS Kwong - 733 2508)

Highways Department (Mr K S Leung - 721 6540)

Highways Department (Mr KS Leung 721 6540)

Highways Department (Mr HS Kwong - 733 2508)

ÞO 398

62:00 2-IT 06.

XH

3SNOH 09

000