about 40 ba and construction of
around 1,110 metres of seawall between Rumsey Street and Tamar to provide land for the expansion of the Central
Business Area and the Airport
Railway Terminus as well as
construction of replacement
ferry piers and air
conditioning intake
facilities.
Highways
1. Route 3 Sector between Kwai Chung and Lai Chi Kok -
construction of approx. 4 km of
a dus1 4-lane highways on
elevated strctures.
2. North Lantau Expressway, Tai Ho
Section - construction of about
6 km of a dual three-lane
highways on north Lantau,
including site formation for
the twin-track airport
railway.
Privatization Projects
3. North Lantau Expressway, Yam O Section construction of about
4 km of a dual three-lane
highways on north Lantau,
including site formation for the twin-track airport railway.
1. Route 3 Sector between Kwai
Chung and Ting Kau - possible bid package for financing, designing, constuction and operation of about 6 km of
dual-three lane roads on a
cable stayed high level bridge,
elvated structures, bored
tunnels, and a medium level bridge.
- 848 2668)
May 1991
August 1991
November 1991
March 1991
Highways Department (Mr HS Kwong - 733 2508)
Highways Department (Mr K S Leung - 721 6540)
Highways Department (Mr KS Leung 721 6540)
Highways Department (Mr HS Kwong - 733 2508)
ÞO 398
62:00 2-IT 06.
XH
3SNOH 09
000
Page 30Page 31