central span of 1 377 metres carrying road and rail traffic from Tsing Yi to Ma Wan.
5. Lantau Fixed Crossing - Kap
Shui Mun Bridge and Ma Wan Viaduct - a bridge of 691 metres including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be constructed on a design and build basis. The viaduct
will link this bridge to the Tsing Ma bridge.
6. Lantau Fixed Crossing Route 3
Interchange - connects Route 3 to the Tsing Ma bridge on the northern side.
7. Lantau Fixed Crossing - Lantau Approach Road and Toll Plaza - about 2 km of approach roads and toll plaza on the south
side of the Tsing Ma bridge.
February 1991
December 1991
August 1991
8. Lantau Fixed Crossing Traffic
December 1991
Control and Surveillance
control and surveilanes
Highways Department (Mr KS Leung 721 6540)
Highways Department (Mr KS Leung 721 6540)
Highways Department (Mr KS Leung 721 6540)
=
Highways Department (Mr KS Leung 721 6540)
-
measures from North Lantau to Kwai Chung.
19. Airport Main Site Formation and
Reclamation - excavation of approx. 90 million cu m of Chek Lap Kok Island and reclamation of about 1,000 ha for the new airport site, including
construction of seawalls and drainage works.
September 1991 (may be advanced to March 1991)
(Prequalification of
tenderers to be carried out prior to tendering)
Civil Engineering
Services Department (Mr MS Leung-368 9768)
•