Kok. Under the Proposal there would remain a
need for this reclamation and for additional
resource allocation for the proposed links from
Stonecutter's Island.
b.
PADS Projects
i.
The initial expenditure to provide the
transportation infrastructure needed to support the New International Airport at Chek Lap Kok is minimised, consistent with compatibility with the
long range planning objectives.
Engineering Feasibility
a.
Mr. Gordon Wu's Proposal
i.
The final three-dimensional configuration of the
multi-track rail and dual three lane road
interchange at the north end of the Sham Ma
Bridge required to meet the design and gradient standards will require careful study and it may be difficult to achieve an acceptable solution.
For example a two percent slope for the high speed rail link might require that the tracks
start to climb as far as two or more kilometers
away, in order to reach the bridge span which