I
must be 60 metres above the channel.
I
The
situation is further
complicated by
by the
location of the Sham Tseng MTR station at the
same location.
ii. The proposed Sham Ma Bridge will require a main
span of
of about 1,000 metres because the north
eastern shoal of Ma Wan Island has to be removed
to satisfy navigational requirements due to the
forecast increase in marine traffic. This will
result in a suspended cable design bridge similar
to Tsing-Ma as being the most economical solution
for that crossing.
iii. The profile of the rail and road alignments from
the south end of the harbour crossings to the
submerged tube west of Green Island must remain
below grade in tunnel as there is not enough
length between those points to use an elevated
viaduct and maintain proper gradient standards.
Separate tubes would also be required due to the
difference in design gradients between road and
rail. This problem was established in previous
PADS Projects studies for the Green Island link.
iv.
In general, the conceptual nature of the Proposal
indicates that there is a significant amount of
engineering study yet to be accomplished before