SCHEDULE OF MEETINGS AND REVIEWS
ITEM
DATE
LOCATION
·L
Initial Technical Meeting
L-
-
17
(1 month after signing LSC)
Beijing
Adaptor Review
L 13.5)
Interface Control Document Review
L
-
13.5)
Beijing
-L
Preliminary Mission Analysis Review
L-
-
13.5)
Final Mission Analysis Review
XSLC Facility
Acceptance Review
L
61
5
Beijing
L
-
7
}
Xichang
-L
Combined Operation Plan/Procedures Review
(Prior to Shipment) Launch Vehicle Review
L- 7
L
2
TBD
1.
Range Readiness Review
-
L 1 (TBD)
Xichang
Launch Readiness Review
L 2 weeks
Xichang
1