SCHEDULE OF MEETINGS AND REVIEWS

ITEM

DATE

LOCATION

·L

Initial Technical Meeting

L-

-

17

(1 month after signing LSC)

Beijing

Adaptor Review

L 13.5)

Interface Control Document Review

L

-

13.5)

Beijing

-L

Preliminary Mission Analysis Review

L-

-

13.5)

Final Mission Analysis Review

XSLC Facility

Acceptance Review

L

61

5

Beijing

L

-

7

}

Xichang

-L

Combined Operation Plan/Procedures Review

(Prior to Shipment) Launch Vehicle Review

L- 7

L

2

TBD

1.

Range Readiness Review

-

L 1 (TBD)

Xichang

Launch Readiness Review

L 2 weeks

Xichang

1

ANNEX I

L

being the

the first day of

corresponding

launch

period and time being expressed in months unless other- wise stated.

7

13