I
2.3.3
All
Detailed Interface Requirements
the detailed interface
in
the ICD (Interface
will requirements
Document), Control
be
XSLC
stipulated including those that are defined in the LM-3 or Users Manuals.
2.3.4
Go/No-Go Criteria
Go/no-go and
criteria for the Launch
both
and Vehicle
Vehicle, Spacecraft
tracking
the Launch
Launch
Spacecraft stations shall be established prior to Readiness Review.
Spacecraft Battery Charging
Battery charging shall be permissible up to TBD minutes before launch.
2.3.5
1
1
2.4
Meetings
to
meet as
often
as
all of the
The Client and CGWIC agree necessary to allow for good and timely excution of activities related to the launch preparation Spacecraft and Launch Vehicle.
A preliminary schedule is given in the following table. Exact dates, location, agenda and participation shall be agreed upon sufficiently in advance on case basis by both parties.
a
case-by-
:-|
ANNEX I
10
Дв
No comments yet.
Private notes are available after approval.