I

2.3.3

All

Detailed Interface Requirements

the detailed interface

in

the ICD (Interface

will requirements

Document), Control

be

XSLC

stipulated including those that are defined in the LM-3 or Users Manuals.

2.3.4

Go/No-Go Criteria

Go/no-go and

criteria for the Launch

both

and Vehicle

Vehicle, Spacecraft

tracking

the Launch

Launch

Spacecraft stations shall be established prior to Readiness Review.

Spacecraft Battery Charging

Battery charging shall be permissible up to TBD minutes before launch.

2.3.5

1

1

2.4

Meetings

to

meet as

often

as

all of the

The Client and CGWIC agree necessary to allow for good and timely excution of activities related to the launch preparation Spacecraft and Launch Vehicle.

A preliminary schedule is given in the following table. Exact dates, location, agenda and participation shall be agreed upon sufficiently in advance on case basis by both parties.

a

case-by-

:-|

ANNEX I

10

Дв

Share This Page