4.4 The arrangement of certain aspects of the turnnel are still being resolved in conjunction with Transport Lepartment. These include the preferred arrangement at the eastern approach where a balance must be struck between highway operations and accessibility, the precise location of the western portals near Fleming Road on the short tunnel, and the slip road arrangement at the western portal.
5. Implications of Retaining HKS Tamar
5.1
which
At the fourth Steering Group meeting it was confirmed that the Study should develop a single plan capable of staged implementation
would allow for the ultimate
relocation of HNS lamar, and that this plan be robust enough to accommodate this relocation whether it be early
or late.
in
three
In
Exhibition
Central cells and
sequentially) ahead of
(either
the Tamar cell.
5.2 The preferred UDP provides for the possibility of staged
reclamat Fon into implementation by dividing the development cells viz Exhibition, Tamar and Central. the late IMS Tamar relocated scenario, reclamation would
proceed
the
concurrently or This would allow the contiraled operation of S Tamar
the trunk road the meantime while construction of
access to the proceed without unduly restricting marine
naval base.
Cal
5,5 Loveve with HMS Tamer
>
ained on
à permanent basis
the
implications are significant:
is)
Construction of the reclamation will affect secmity of
the naval base because iban development will enclose
it more than at present.