4.
Trunk koad - Alignment and Operational Aspects
4.1
The trunk road is planned to be below ground in tunnel for
the section from Central to Exhibition, a tenath of
2.4 km. This is the section of reclamation which will be
most intensively developed and the tunnel location has been selected to remove traffic from the new development areas, to reduce the impact of traffic and road structures from
these areas, and to increase the area of land available for
development. It also would allow for late relocation of
LMS Tame'.
4.2 The location of the trunk road will be below a major new
distributor road on the reclamation which has been located
to give the best arrangement for access and circulation and
the preferred land development plan. A The Central ami
Tamar cells the trunk road tunnel will be towards the
centre of the new reclamation whilst at the Exhit ition cell
it will be close to the existing seawall.
4.3 The trunk road has been planned to allow for all
operational requirements of major roads in tunnels :-
advance direction sigining will be provided
where required within the tunnel;
overheight vehicle detection will be provided
at all entry locations;
tunnel close will be pessible for maintenance
and emergencies with traffic directed to other
Tubes on to the surface road network.
weaving and merging/aiveraing
Trave
been removed from tunnel sections of the bunk
road by making provision
For these
the
tunnel approaches and by separating long and
/p.8