TNAG-1911-FCO40-2715-Financial-assistance-from-the-UK-Government-to-Vietnamese-re-1989 — Page 119

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

3. DESIGN CONCEPT

QISMEN

aba 7k4 F.Ab

3

(A) Minimise geotechnical and site formation works to reduce construction

period and captial cost.

use existing flattish area tor Stage I accommodation for

VBP S

10.000

use existing helipad site for Stage 1) accommodation for additional 10,000 VBPS

use best of existing buildings capable of conversion to new needs, e.g. LPG or DG scores, generator/diesel stores, switch rooms,

etc.

ail in preference to dotting buildings over hillsides with extensive slope cutting, retaining walls, increased underground plumbing, electrical, drainage services, fencing and increased security and management problems.

(B) Maximise the use of 3-storey buildings to afford space in camp areas

for group activities.

(C) Maximise facilities in view of remoteness of island to give

reasonable measure of self-dependence.

Kitchen and food storage

- Medical services

Segregation units

Workshop and services (VAs)

Staff accommodation/mess/recreational facilities

(D) Permanent and reliable building services to avoid health and safety

hazards

fresh, trap ed water supply by WSD

-

Sewage ratment system recommended by CPD

mains electrical supply by CL & p

-

- fire fighting system requirements of FSD

new pier by CE/PW to provide berthing depth of 3m

(E) Crowd control,

management

5.2m high fenced compounds to facilitate crowd control, security and camp management

ADAABA

/P. 4

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.