1989-10-11 16:46 SECURITY BRANCH

2. ROUGH INDICATION OF COSTS

1 var að draga vadiem – súcsément TALAAN, SAKKadhaider fiks Szakké

CS

(A) Supply & erection of Prefab Buildings

41 No. 3-storey at $1.7m

2 No. 1-storev AU $0.5m

(B) Builders work in concrete foundations,

drainage, washing areas, toilets, storage tanks, plumbing, transformer 100m, etc.

852 5 868 5074 P.05

Stage 1

Sm

Slave t

Sm

Total

$m

32.80

37.90

70.70

water

30.00

13.30

43.30

(C) Electrical installations, perimeter

lighting, fire fight ing system, water pumping systems, LPC storage, etc.

23.00

11.80

34.80

(D) Geotechnical works

7.00

8.00

15.00

(E) Security perimeter tences (5.2m high)

3.50

4.50

8.00

(F) Water Supply

55.00

55.00

- WSD submarine pipeline ($55m)

desalination plant

($2/m)

M

harged supply

(S)

(G) Sewage Treatment

60.00

60.00

EPD full system

($60m)* ($12m)

Floating Barge(s)

(H) CL & P elect, mains supply

(I) Berthing Pier (Port Works)

(J) Contingency

Notes

1. Whitehead costs for Stages I & II

2. Pillar Point

ADAABA

A

10.00

10.00

12.00

8.00

20.00

$233.30m

$83.50m

3316.80m

say $320

Av. cost per head = $16,000

$140.6m for 8,000 population

$79m for 5,000 population -

$17,575 per head.

$15,800 per head.

- • •

/P. 3