1989-10-11 16:46 SECURITY BRANCH
2. ROUGH INDICATION OF COSTS
1 var að draga vadiem – súcsément TALAAN, SAKKadhaider fiks Szakké
CS
(A) Supply & erection of Prefab Buildings
41 No. 3-storey at $1.7m
2 No. 1-storev AU $0.5m
(B) Builders work in concrete foundations,
drainage, washing areas, toilets, storage tanks, plumbing, transformer 100m, etc.
852 5 868 5074 P.05
Stage 1
Sm
Slave t
Sm
Total
$m
32.80
37.90
70.70
water
30.00
13.30
43.30
(C) Electrical installations, perimeter
lighting, fire fight ing system, water pumping systems, LPC storage, etc.
23.00
11.80
34.80
(D) Geotechnical works
7.00
8.00
15.00
(E) Security perimeter tences (5.2m high)
3.50
4.50
8.00
(F) Water Supply
55.00
55.00
- WSD submarine pipeline ($55m)
desalination plant
($2/m)
M
harged supply
(S)
(G) Sewage Treatment
60.00
60.00
EPD full system
($60m)* ($12m)
Floating Barge(s)
(H) CL & P elect, mains supply
(I) Berthing Pier (Port Works)
(J) Contingency
Notes
1. Whitehead costs for Stages I & II
2. Pillar Point
ADAABA
A
10.00
10.00
12.00
8.00
20.00
$233.30m
$83.50m
3316.80m
say $320
Av. cost per head = $16,000
$140.6m for 8,000 population
$79m for 5,000 population -
$17,575 per head.
$15,800 per head.
- • •
/P. 3