3. DESIGN CONCEPT
QISMEN
aba 7k4 F.Ab
3
(A) Minimise geotechnical and site formation works to reduce construction
period and captial cost.
use existing flattish area tor Stage I accommodation for
VBP S
10.000
use existing helipad site for Stage 1) accommodation for additional 10,000 VBPS
use best of existing buildings capable of conversion to new needs, e.g. LPG or DG scores, generator/diesel stores, switch rooms,
etc.
ail in preference to dotting buildings over hillsides with extensive slope cutting, retaining walls, increased underground plumbing, electrical, drainage services, fencing and increased security and management problems.
(B) Maximise the use of 3-storey buildings to afford space in camp areas
for group activities.
(C) Maximise facilities in view of remoteness of island to give
reasonable measure of self-dependence.
Kitchen and food storage
- Medical services
Segregation units
Workshop and services (VAs)
Staff accommodation/mess/recreational facilities
(D) Permanent and reliable building services to avoid health and safety
hazards
fresh, trap ed water supply by WSD
-
Sewage ratment system recommended by CPD
mains electrical supply by CL & p
-
- fire fighting system requirements of FSD
new pier by CE/PW to provide berthing depth of 3m
(E) Crowd control,
management
5.2m high fenced compounds to facilitate crowd control, security and camp management
ADAABA
/P. 4