(b) the design so submitted has been approved under
section 25(3) or has been exempted from approval
under section 25(1);
(c)
the method of its construction has been approved
under section 27;
(a)
where the works are to be carried out by a
contractor, the terms of any contract between the
Road Company and such contractor have been
approved under section 28 or do not require such
approval by virtue of that section.
Road Company to submit
designs.
24.
(1) As soon as practicable after the
commencement of this Ordinance, the Road Company shall
submit to the Director for his approval under section 25
the design of the construction works.
(2) Such design may relate to the whole of the
construction works or may be prepared in divisions in
accordance with subsection (3).