Where the design is prepared in divisions, each
division shall relate to such part of the construction
works and be prepared in such order as may be agreed
between the Director and the Road Company or, in the
absence of such agreement, as the Director may determine.
Approval and exemption of designs by
the
Director.
25. (1) Upon receipt of a design submitted to him
for his approval under this section the Director may,
by endorsement thereon, exempt that design from the
provisions of this section.
(2) Where the design is not exempted from the
provisions of this section the procedures for the approval
of that design by the Director shall be such as may be
agreed between the Director and the Road Company or, in the
absence of such agreement, as the Director may determine.
(3) After due completion of the procedures referred
to in subsection (2), or such of those procedures as the
Director may consider appropriate in any particular case,
the Director may approve or disapprove the design or may
approve it in part and disapprove it in part.