(b) the design so submitted has been approved under

section 25(3) or has been exempted from approval

under section 25(1);

(c)

the method of its construction has been approved

under section 27;

(a)

where the works are to be carried out by a

contractor, the terms of any contract between the

Road Company and such contractor have been

approved under section 28 or do not require such

approval by virtue of that section.

Road Company to submit

designs.

24.

(1) As soon as practicable after the

commencement of this Ordinance, the Road Company shall

submit to the Director for his approval under section 25

the design of the construction works.

(2) Such design may relate to the whole of the

construction works or may be prepared in divisions in

accordance with subsection (3).

Share This Page