CONFIDENTIAL
密
LANDS DIVISION
LANDS AND WORKS BRANCH PROGRESS REPORT
1st February 1982 to 30th April 1982
Subject
a) N. Lantau
(LW(3PU)70/61/10)
Purpose
basis for the selection of a preferred develop- ment strategy.
Progress Made & Present Position
Next Quarter Targets
(a) N. Lantau
(i) The steering group
established to guide the further development of
conceptual planning pro-
posals and detailed engineering studies con- tinued with its work
programme.
(ii) Consultancy study on the
replacement airport at Chek Lap Kok continuing. General feasibility studies have been completed and more detailed civil
engineering, environmental, financial, meteorological and master plan studies are proceeding.
(iii)Detailed design of the
Lantau Fixed Crossing being carried out by
consultants.
(b
N.W. New Territories
(Sru) 70/61/03)
(b) N.. New Territories
(i)
Consultants commenced work on a base strategy to
(a) N. Lantau
(i)
Monitor
Progress of the further studies (completion September 1982).
(ii) Monitor pro-
gress in studies relating to CLK
replacement airport.
(iii)Monitor pro-
gress in detailed
design of the Lantau Fixed
Crossing.
(b) N.w. New
Territories
(i) Consultants