3.
CONFIDENTIAL
require the assistance of non-uniformed personnel for preventive and
corrective maintenance outside planned refits and DEDs.
Workshops, Maintenance Spaces and Offices
4.
a.
Offices (Part E, paragraph 2e refers)
A Central Administrative Office is to be provided. It is to
be fitted out to facilitate the efficient handling of the administrative
work of all Departments.
10.
Workshops and Maintenance Spaces
(1) To be rationalised and integrated to the maximum practicable degree
to prevent duplication of equipment and to give economy of man-
power.
(2) To be consistent with the provision of maintenance facilities
necessary to enable ships staff to carry out corrective and
preventive maintenance. These facilities are to include arrangements
for stowage for such maintenance aids as: Ancillary Support
Equipments, Special Tools, Rationalised Tool Kits and CRETE where
such stowage is not more efficiently located in the relevant
equipment compartments.
SHIP UPKEEP PLAN REQUIREMENTS
The NOTE at Part A, paragraph 2c refers.
NOTE
a.
Maximum Continuous Period at Sea or at Immediate Notice
The period during which the Ship must be capable of continuous
operations at sea or at Immediate Notice is 10 days.
b. Notice
(1) Normal notice for sea is 4 hours.
(2) Extended notice is 47 hours.
In order to ensure that sufficient craft are available during a period of Tension/Confrontation, the usual notice during a LSP will be 8 hours (Part A Paragraph 2c NOTE refers).
23
CONFIDENTIAL