to keep options open, and to hold the decisions to act against other
buildings until the results of the Building exercise can be assessed,
an unavoidable element in the decision to go ahead with Building E, is
Government's acceptance to act against the rest, and to identify the
remaining 25 buildings at an early stage, if need be.
29.
Irrespective of what tactical options are taken at the time of
action, Building E will be the inevitable focal point of attention. It is
absolutely important that the exercise be executed swiftly, with the minimur
of opposition. The reasonableness of compensation and rehousing terms are
accordingly fundamental.
Phasing
30.
In order to overcome some of the difficulties described in
para. 27(a) above it is proposed that action against the 26 buildings be
roughly classified, using as criteria, height and accessibility in the following
stages (each stage if necessary could be sub-divided into a number of phases)
with priority given to those presenting the greatest risk:-
Stages
Buildings
1
E
2
F, G, J, J.
3
C, D, H.
4
F1, K, L, M.
5
11, MM, MM, 00, PP, QQ, RR, SS, UU.
6
N, DD, EE, GGHH, XX.
A plan showing the distribution of the 26 buildings and their respective
stages is at Appendix VII and a table showing a brief description of the
problem inherent in the different stages is at Appendix VIII.
CONFIDENTIAL
機密
/Conclusion..