12.1

The estimated cost of forming the site for the Container Terminal together with orders of cost of developing and equipping it are based on current rates and prices. No allowance has been made for possible variations in these prior to construction.

Summary

12.2

The costs are set out in Table 8.

TABLE 8: DETAILS OF COSTS ($ MILLION)

Item

Stage 1 (2 berths)

Stage 2 (1 berth)

Stage 3 (1 berth)

Total (4 berths)

Estimated cost of forming the site

(i) Containership-berth quaywall

23.0

8.4

10.2

41.6

(ii) Lighter-berth seawall

2.0

2.3

3.1

7.4

(iii) Dredging of material before reclamation ...

0.9

0.5

1.1

2.5

(iv) Reclamation fill

11.9

8.9

13.1

33.9

(v) Sand or paper drains

2.6

3.2

3.3

9.1

(vi) Approach channel dredging

3.2

0.2

1.0

4.4

Sub-total

43.6

23.5

31.8

98.9

Say

44

24

32

100

Order of cost for developing the site

(viii) Surfacing

(ix) Buildings

(x) Flyover access

***

(xi) Water supply distribution mains

(xii) Surface water drains and sewerage

(xiii) Fencing

(xiv) Electric power & Lighting

Sub-total

Say

:

:

:

:

6.0

4.0

10.3

7.4

2.0

281

5.2

15.2

6.6

24.3

2.0

0.3

0.2

0.2

0.7

1.5

2.5

1.7

5.7

0.1

0.1

0.1

0.3

2.1

1.3

1.6

5.0

22.3

15.5

15.4

53.2

22

223

16

15

53

Order of cost of equipping the Terminal

(xiv) Container cranes

(xv) Straddle carriers

(xvi) Fork lift trucks

Sub-total

Say

TOTAL

:

:

:

:

:

:

:

52

26.8

13.4

13.4

53.6

19.5

9.8

9.8

39.1

2.4

1.7

2.5

6.6

48.7

24.9

25.7

99.3

49

25

26

100

S

115

65

73

253