12.1
The estimated cost of forming the site for the Container Terminal together with orders of cost of developing and equipping it are based on current rates and prices. No allowance has been made for possible variations in these prior to construction.
Summary
12.2
The costs are set out in Table 8.
TABLE 8: DETAILS OF COSTS ($ MILLION)
Item
Stage 1 (2 berths)
Stage 2 (1 berth)
Stage 3 (1 berth)
Total (4 berths)
Estimated cost of forming the site
(i) Containership-berth quaywall
23.0
8.4
10.2
41.6
(ii) Lighter-berth seawall
2.0
2.3
3.1
7.4
(iii) Dredging of material before reclamation ...
0.9
0.5
1.1
2.5
(iv) Reclamation fill
11.9
8.9
13.1
33.9
(v) Sand or paper drains
2.6
3.2
3.3
9.1
(vi) Approach channel dredging
3.2
0.2
1.0
4.4
Sub-total
43.6
23.5
31.8
98.9
Say
44
24
32
100
Order of cost for developing the site
(viii) Surfacing
(ix) Buildings
(x) Flyover access
***
(xi) Water supply distribution mains
(xii) Surface water drains and sewerage
(xiii) Fencing
(xiv) Electric power & Lighting
Sub-total
Say
:
:
:
:
6.0
4.0
10.3
7.4
2.0
281
5.2
15.2
6.6
24.3
2.0
0.3
0.2
0.2
0.7
1.5
2.5
1.7
5.7
0.1
0.1
0.1
0.3
2.1
1.3
1.6
5.0
22.3
15.5
15.4
53.2
22
223
16
15
53
Order of cost of equipping the Terminal
(xiv) Container cranes
(xv) Straddle carriers
(xvi) Fork lift trucks
Sub-total
Say
TOTAL
:
:
:
:
:
:
:
52
26.8
13.4
13.4
53.6
19.5
9.8
9.8
39.1
2.4
1.7
2.5
6.6
48.7
24.9
25.7
99.3
49
25
26
100
S
115
65
73
253