these procedures and if they appear excessively
demanding I will investigate whether they can be
modified.
5.
In future each territory's overall development policy
and programme will be considered here es hitherto
and H.M.G. will enter into a forward commitment to
Having regard to the
provide £x development aid over a period of years
ahead (usually three years).
probably rate of expenditure, we shall indicate how it
is expected that disbursements by U.K. financial
years will be phased and in general terms the sectors
on which such aid is expected to be concentrated.
and States
budgetary aided territories/it will be expected that
development aid will be devoted to the maximum
extent possible to productive development with a
view to an increase in local revues which will help
In
to reduce and it is hoped eventually eliminate the need
for budgetary assistance. It is recognised of course
that in some of the smaller territories the scope
for economic development is limited. Although it
will be expected that expenditure planning will be so
arranged as to keep within the disbursement figures
indicated for each U.K. financial year, it is
recognised that it is not possible to combire smooth
administration of longer-term programes with rigid
limits on the annual expenditure, and some flexibility) will
probably be permitted subject to the fact that we
are ourselves constrained by annual ceilings on total
aid disbursements.
6.
Development aid, whether grant or loan, will as
now be provided for approved individual projects but
a "project" could be, illustratively, a building or
part of a complex of buildings, c.g. an office block,
school or hopsital; a vessel; a defined phase of a
/roads