23
Neu Isenburg
יד
123
Isent
632
E
ос
For a demonstration of Chrysler Airtemp air conditioning, join the rush hour in the Frankfurt Subway.
Or reserve a table at the Okura Hotel's garden restaurant in Tokyo.
Chrysler Airtemp goes all overtheworld making people more comfortable.
No place is too big or too small. Just look at the main station of the Frankfurt Subway. Two Chrysler Air- temp Whirl-Pac C2 centrifugals cool three levels of the building. This in- cludes passenger loading platforms, 26 shops, the main control and switch rooms, the boiler rooms, emergency power rooms, four restaurants, a num- ber of offices, and the ground floor of a major department store. 10,000 square meters in all. On the other hand, look at this restaurant at the
Okura Hotel. Several custom upflow Chrysler Airtemp gas-fired furnaces keep thousands of customers comfort- able during the winter. They keep the soup warm, too.
Because Chrysler Airtemp special. izes in air conditioning, you always get the unit that exactly fits your de- sign needs. And because Chrysler Air- temp systems are sold and serviced by local people in every part of the world, someone is always nearby to assist in system design.
The Frankfurt installation was done by Ruhaak GmbH. The Tokyo installa- tion was done by Marutomi Electric Co., Ltd.
For the name of your local Chrysler Airtemp repre- sentative, write:
Mr. P. Skov-Nielsen
18, House 11, 1-Chome, Shimorenjaku, Mitaka-Shi Tokyo, Japan
ог
Dr. Alex Babalitis 41a Stubbs Road/F2-16 Hong Kong
Airtemp
CHRYSLER
CORPORATION
32
Far East BUILDER, September 1970
No comments yet.
Private notes are available after approval.