swimming pool will meet
›
Olympic Games
and third and highest 10 metres from the ground.
On the edge of the pool at the diving stage end, will be spring- boards
one metre high and three metres high.
-
Both the swimming and diving pools will be up to international meet specifications including those of the Olympic Games.
Two filtration plants are required. They will probably be used alternate- ly, and be set up on the highest level in the site.
This will enable the best flow of water from the plant down to the modern bowl shaped aerator which will keep the water fresh and then down to the pools.
To ensure clean bathers, footbaths and water cascades will be placed on ways leading to both pools.
A saw-tooth roofed
roofed one-storey block of 32 changing rooms with showers and lockers will be built by the side of the pools. There will also be an office and restaurant premises.
A free-form wading pool, 10 inches deep, with a flat bottom, will enable 50 children to play there. Nearby there will be a fully equipped playground.
THE HONG KONG & FAR EAST BUILDER
SITE
PLAN
SCALE
22
-
VOLUME 17, NUMBER 6
44 YD.
FILTER HOUSE
„PUMP HOUSE
I CANTE
CANTE
SWIMMING
POOL
AERATOR
LAWN
VING POOL
CHANGING RM
WELD
FUTURE PAVILION & OFFICE
OFFICIALS CAR PARK
PADDLING CHILDREN'S
POOL
PLAYGROUND
PUBLIC
CAR
PARK
ROAD
PROPOSED
ROUNDABOUT
WELD
ROAD
85