swimming pool will meet

Olympic Games

and third and highest 10 metres from the ground.

On the edge of the pool at the diving stage end, will be spring- boards

one metre high and three metres high.

-

Both the swimming and diving pools will be up to international meet specifications including those of the Olympic Games.

Two filtration plants are required. They will probably be used alternate- ly, and be set up on the highest level in the site.

This will enable the best flow of water from the plant down to the modern bowl shaped aerator which will keep the water fresh and then down to the pools.

To ensure clean bathers, footbaths and water cascades will be placed on ways leading to both pools.

A saw-tooth roofed

roofed one-storey block of 32 changing rooms with showers and lockers will be built by the side of the pools. There will also be an office and restaurant premises.

A free-form wading pool, 10 inches deep, with a flat bottom, will enable 50 children to play there. Nearby there will be a fully equipped playground.

THE HONG KONG & FAR EAST BUILDER

SITE

PLAN

SCALE

22

-

VOLUME 17, NUMBER 6

44 YD.

FILTER HOUSE

„PUMP HOUSE

I CANTE

CANTE

SWIMMING

POOL

AERATOR

LAWN

VING POOL

CHANGING RM

WELD

FUTURE PAVILION & OFFICE

OFFICIALS CAR PARK

PADDLING CHILDREN'S

POOL

PLAYGROUND

PUBLIC

CAR

PARK

ROAD

PROPOSED

ROUNDABOUT

WELD

ROAD

85

Share This Page