The central airconditioning plant has two units: one supplies the ground, mezzanine, first and second floors: the other the rest of the building. The units are designed to operate all through the year.
General contractor for the Bank was the Foo Wing Building Con- struction Co. and other sub-contrac- tors included:
PLUMBING: Lee Yu Kee Ltd. ELECTRICAL: Globe Electrical
Co.
AIR-CONDITIONING: American Engineering Corporation Cor- poration.
LIFTS: Otis Elevator Co. INTERIOR AND WOODWORK:
Lam Tak Shing.
HARD-
Tomes
ALUMINIUM WORK: Architec-
tural Aluminium Ltd. DOOR LOCKS AND WARE: Shewan (Schlage). STRONGROOM DOORS: Shewan
Tomes (Chatwood-Milner).
She-
ARMOURPLATE GLASS:
wan Tomes (Pilkington). WATER HEATING AND COOK- ING EQUIPMENT: Hong Kong and China Gas Co. Ltd. WATERPROOFING: Vai Cheong and Co. (Colpave mastic (rock) asphalt).
BURGLAR ALARM SYSTEM:
The Jardine Engineering Cor- portion Ltd.
동도
SCAL
CALE
8
16 FT.
ILCHISHED
AV.
ASHIER BOOTH
BANK OFFICE
BANK OFFICE
MOTOR
RM.
ROOF
6TH. FL.
S
5TH. FL.
Π
BANK OFFICE
R
4TH FL
R
円
BANK: OFFICE
3RD FL.
BANK OFFICE
2ND FL
BANK OFFICE
BANKING HALL
PIPE DUCT
SECTION
'A-A
46
PIT
لها
IST. FL.
GRD. FL.
BAST. FL.