The central airconditioning plant has two units: one supplies the ground, mezzanine, first and second floors: the other the rest of the building. The units are designed to operate all through the year.

General contractor for the Bank was the Foo Wing Building Con- struction Co. and other sub-contrac- tors included:

PLUMBING: Lee Yu Kee Ltd. ELECTRICAL: Globe Electrical

Co.

AIR-CONDITIONING: American Engineering Corporation Cor- poration.

LIFTS: Otis Elevator Co. INTERIOR AND WOODWORK:

Lam Tak Shing.

HARD-

Tomes

ALUMINIUM WORK: Architec-

tural Aluminium Ltd. DOOR LOCKS AND WARE: Shewan (Schlage). STRONGROOM DOORS: Shewan

Tomes (Chatwood-Milner).

She-

ARMOURPLATE GLASS:

wan Tomes (Pilkington). WATER HEATING AND COOK- ING EQUIPMENT: Hong Kong and China Gas Co. Ltd. WATERPROOFING: Vai Cheong and Co. (Colpave mastic (rock) asphalt).

BURGLAR ALARM SYSTEM:

The Jardine Engineering Cor- portion Ltd.

동도

SCAL

CALE

8

16 FT.

ILCHISHED

AV.

ASHIER BOOTH

BANK OFFICE

BANK OFFICE

MOTOR

RM.

ROOF

6TH. FL.

S

5TH. FL.

Π

BANK OFFICE

R

4TH FL

R

BANK: OFFICE

3RD FL.

BANK OFFICE

2ND FL

BANK OFFICE

BANKING HALL

PIPE DUCT

SECTION

'A-A

46

PIT

لها

IST. FL.

GRD. FL.

BAST. FL.