THE HONG KONG AND FAR EAST BUILDER
The Wong Kiang (i) Hydroelectric Project Wong Kiang, Yingtak, North Kwangtung.
40 YEARS EXPERIENCE
IN PROTECTING & WATERPROOFING CONCRETE & STEELWORK
Inertol
Roofing Protection the Inertol Way
Protects Your Gables and Saves Decay
STOCKS CARRIED STOCKS
SIBER HEGNER & CO., LTD.
ST. GEORGE'S BLDG.
TEL. 226 25
HONG KONG
In view of the inadequate power supply in Canton and other cities in northern Kwangtung, the National Hydro- electric Engineering Bureau of the National Resources Commission, China, plans to build a hydroelectric station on the Wong Kiang River in Yingtak. After over two and a half years of investigation, planning and design the project will go into construction in the very near future.
The investigation and planning work was carried out by Mr. W. Szeto, Senior Planning Engineer of the Bureau, while the design of the dam, power station and other structures were made by the Design Section of the same organization.
The project will be built in two stages at a cost of US$13,000,000.00 for the first stage and about US$7,000,000.00 for the ultimate stage when the dam will be raised fourteen metres in height. Installed capacity for the initial stage will be 40,000 KW. This capacity will be doubled in the ultimate development.
Super
WHITE PORTLAND
CEMENT
AALBORG
Particulars.
First Stage.
Second Stage.
Constant angle, concrete arch Height of dam
51 m. 230 m.
65 m.
290 m.
14 sq. km.
71 sq. km.
38.5 m.
52,5 m.
Crest length of dam
Reservoir area
Operating head
Spillway capacity
""
gates
Gates
'L
I
O
N'
WHITE
MADE IN
丑
AALBORG
DENMARK
WHITE
PORTLAND CEMENT
Sole Agents
WORK
CEMENT
PORTLAND
BRAZO
N
D
Shewan Jomes & Co., Ltd.
Chung Tin Bldg,
Stock Carried By
Tel. 27781.
TUNG ON CO.
36/38 Lockhart Road
Tel. 31321.
Min. flow of river
Average flow
Max. flood flow (gauged)
"
11
Intake tunnel
(calculated)
Installed capacity Power house Transmission lines
Access route
7500 c.m.s.
14 Nos. 12m.x6.5m. Radial
19 c.m.s.
165
2250 c.m.s.
6500
7 m. 40,000 KW
diam.
80,000 KW R.C. semi-outdoor type Two double-circuit 110 KV steel tower lines
Five km. branch railway line from Hankow-Canton Railway at Yingtak.
Mr. W. Szeto, B.Sc.. A.M.L.C.E., A.M.Am. Soc.C.E., G.I.Mech.E.. A.L.S.E., has recently arrived in Hong Kong and opened an engineering office in Room 401. Hong Kong and Shanghai Bank Building. Besides the above investiga- tion and planning work in China, Mr. Szeto has just had several years in U.K. as Assistant Engineer with Babtie, Shaw and Morton, Civil Engineers, of Glasgow, where he was working on design of water supply and sewage dis- posal schemes, jetties and piling, reinforced concrete and soil mechanics investigation. He had experience also as Assistant Civil Engineer with the Scottish Division of the London, Midland and Scottish Railway on design of bridges and reinforced concrete railway structures.