THE HONG KONG AND FAR EAST BUILDER

The Wong Kiang (i) Hydroelectric Project Wong Kiang, Yingtak, North Kwangtung.

40 YEARS EXPERIENCE

IN PROTECTING & WATERPROOFING CONCRETE & STEELWORK

Inertol

Roofing Protection the Inertol Way

Protects Your Gables and Saves Decay

STOCKS CARRIED STOCKS

SIBER HEGNER & CO., LTD.

ST. GEORGE'S BLDG.

TEL. 226 25

HONG KONG

In view of the inadequate power supply in Canton and other cities in northern Kwangtung, the National Hydro- electric Engineering Bureau of the National Resources Commission, China, plans to build a hydroelectric station on the Wong Kiang River in Yingtak. After over two and a half years of investigation, planning and design the project will go into construction in the very near future.

The investigation and planning work was carried out by Mr. W. Szeto, Senior Planning Engineer of the Bureau, while the design of the dam, power station and other structures were made by the Design Section of the same organization.

The project will be built in two stages at a cost of US$13,000,000.00 for the first stage and about US$7,000,000.00 for the ultimate stage when the dam will be raised fourteen metres in height. Installed capacity for the initial stage will be 40,000 KW. This capacity will be doubled in the ultimate development.

Super

WHITE PORTLAND

CEMENT

AALBORG

Particulars.

First Stage.

Second Stage.

Constant angle, concrete arch Height of dam

51 m. 230 m.

65 m.

290 m.

14 sq. km.

71 sq. km.

38.5 m.

52,5 m.

Crest length of dam

Reservoir area

Operating head

Spillway capacity

""

gates

Gates

'L

I

O

N'

WHITE

MADE IN

AALBORG

DENMARK

WHITE

PORTLAND CEMENT

Sole Agents

WORK

CEMENT

PORTLAND

BRAZO

N

D

Shewan Jomes & Co., Ltd.

Chung Tin Bldg,

Stock Carried By

Tel. 27781.

TUNG ON CO.

36/38 Lockhart Road

Tel. 31321.

Min. flow of river

Average flow

Max. flood flow (gauged)

"

11

Intake tunnel

(calculated)

Installed capacity Power house Transmission lines

Access route

7500 c.m.s.

14 Nos. 12m.x6.5m. Radial

19 c.m.s.

165

2250 c.m.s.

6500

7 m. 40,000 KW

diam.

80,000 KW R.C. semi-outdoor type Two double-circuit 110 KV steel tower lines

Five km. branch railway line from Hankow-Canton Railway at Yingtak.

Mr. W. Szeto, B.Sc.. A.M.L.C.E., A.M.Am. Soc.C.E., G.I.Mech.E.. A.L.S.E., has recently arrived in Hong Kong and opened an engineering office in Room 401. Hong Kong and Shanghai Bank Building. Besides the above investiga- tion and planning work in China, Mr. Szeto has just had several years in U.K. as Assistant Engineer with Babtie, Shaw and Morton, Civil Engineers, of Glasgow, where he was working on design of water supply and sewage dis- posal schemes, jetties and piling, reinforced concrete and soil mechanics investigation. He had experience also as Assistant Civil Engineer with the Scottish Division of the London, Midland and Scottish Railway on design of bridges and reinforced concrete railway structures.