No_12_December_1968 — Page 28

Far East Builder 遠東建築雜誌 All

Section B-B

ST.

TER THEM TRAPPIE EDITININ

EDITING

CAPTION WRITERS

FILM STORE

AUDIO OFFICE

STUDIO

ubio

строю

| MAKE-UP

STUDIO

STUDIO

STUDIO

DUBBING

STUDIO

$TUDIO

STUDIO

DUBBING STUDIO

A/C SUPPLY DUCT

STUDIO

CAR

PARK

RETURN

A/C SUPPLY DUCT

CENERIES

PARK

LIFT

MACHINE

RM.

EQUIPMENT AUDIO PRO

MAINT.

VISION PROOT. AUDIO

VISION

PROD

AUDIO

DUBBING

STUDIO

EDITING

SPLICING

STUDIO

STUDIO

CORRIDOR

ONIA MA

STUD.1 0

WORKING

SPACE

AXC PLANT R.

CORRIDOR

CORRIDOR

CORRIDOR

GRO, FL. LEY.

[

собаром

TELECINE

TELEONE TELECINE TELECINE

A/C

8

LOBEY

VIDEOTAPE

STUDIO

STORE

WORKING

SPACE

First floor plan

EQUIP MAINT

CAHOPY

PROD VISION PROD

CONT CONTROL WAITING CONT

TAPE bunes-d

CHINESE AUDIO OFFICE

CHINESE

AUDIO OFFICE

CHINESE AUDIO

LAY.

STUDIO

STUDIO

OFFICE

UPPER STUDIO

UPPER

STUDIO

UPPER

STUDO

STUDIO

CONTROL

CHINESE

AUDIO OFFICE

ENGLISH CHANNEL

STUDIO

STUDIO

STUDIO

UPPER

STUDIO

UPPER

UPPER

ENGLISH LIBRARY

STUDIO

CHINESE

STUDIO

STUDIO

AUDIO OFFICE

STUDIO

ST.

LAW.

[ENGINEEL OFFICE

CONT.

PROD

LOBBY

Third floor plan

(CENTRAL CONTROL

DI CHIN

KITCHEN

CANTEEN

ENG.

CONTROL WAITING CONT DISC

AUDIO EQUIP

NEC.

CARE TAKER

ST.

ECITING EDITING

EXIT.

CAPTION WRITER'S

FILM STOCK

FILM TRAPPIC

ST.

FILM STORE,

LOTINE

STUDIO ST.

V.I.P. DINING

ENGHEER

LIBRARY

k

EDITING NEG.

PROJ.

FILM ST. OFFICE

ENGLISH PRODUCEA

ACCOUNTS

PLM ST.

SCREENING

CHEF

CER

LOBBY

OFFICE

CHIEF ACCOUNT.

Fourth floor plan

26

25

SECA

GENERAL MANAGER

Section A-A

of aircraft noise the television studios have been located right in the centre of the building, with the office areas on four sides and above. Freedom from vibration has been ensured by isolating the studios from the ground by the use of double concrete floors with 4 in. of rockwool floor batts in between. All floors are laid to an overall smoothness and within a fall of 1 in 3,000.

Walls are of reinforced concrete with a fibreglass quilt in the 4 in. air space and a 9 in. brick wall on the in- side. The brick wall has been surfaced with exposed rockwool held in posi- tion by timber battens and the ceiling is suspended Cellotex.

The building structure is reinforced concrete throughout. It is supported on a driven pile foundation. The peri- meter, which is used for the offices, is treated as a column with a plate slab, eliminating the need for beams, and the core is surrounded by a shear wall. Floors over the central area are sup- ported by concrete wall beams.

Doors into the studios and quiet areas are solid timber with an outer set of doors separated by a 6 in. air space. Both sets are fitted with closers and close on to neoprene tubes.

The siting of offices and corridors around the perimeter of the studios, apart from providing a sound barrier, also allows easy circulation and access. It allows, in addition, direct access by the public to the audience studio and first floor viewing gallery while debar-

Far East BUILDER, December 1968

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.