Estimates-1966 — Page 224

Estimates 財政預算 All

218

No.

DRAINAGE — Contd.

Appendix IV-Contd.

Project

A

B

C

DN6

Yuen Long Flood Control, Stage III

62/2

62/1

DN7

Yuen Long Flood Control, Stage IV

63/3

63/2

62/1

DN8

Yuen Long Flood Control, Stage V and Shan Ha Road

61/3

61/2

DN9

Yuen Long Flood Control, Stage VI

62/3

62/1

DN10 Yuen Long Intercepting Sewers and Sewage Disposal, Stage I

64/3

63/3

62/1

DN11

Yuen Long Intercepting Sewers and Sewage Disposal, Stage II

62/1

DN12 Sha Tau Kok Development

62/3

60/3

DN16 Kwai Chung Development, Areas 10B and 10E (part), Roads and

Drainage

64/3

DN19

DN17 Tsuen Wan Area 8, Development—Additional Resite Area DN18 Kwai Chung Offensive Trades Area 26A, Roads and Drainage Works

Shek Wu Hui Sewage Disposal Investigation

64/3

64/3

64/3

PORT WORKS

PN1

Dredging for improvement in natural anchorage at Lung Shuen Wan,

Rocky Harbour

62/3

PN2

Dredging for improvement in natural anchorage at Chek Keng, Long

Harbour

62/3

PN3

Dredging to improve Natural Anchorage at Tai O Creek

64/1

63/3

59/

PN4

Sai Kung Typhoon Shelter

58/

PN5

Typhoon Shelter for South Western Approaches

62/1

PN6

Tai Po Typhoon Shelter

62/2

62/1

†PN7

Tap Mun Typhoon Shelter

59/3

PN8

Castle Peak Pier

63/3

PN9

Pier at Ap Chau, Sha Tau Kok

60/3

PN10

Chek Keng Pier, Long Harbour

61/3

PN11

Kau Lau Wan Pier, Long Harbour

64/3

61/3

PN12

Wong Shek Pier, Long Harbour, Tai Po

64/3

63/3

PN14

Landing Stage-Waglan Island

64/3

64/2

PN22

Tsuen Wan Ferry Pier

64/3

† Deleted

DEVELOPMENT

DENI Castle Peak Development, Stage I (Preliminary Works) DEN2 Castle Peak Development, Stage I (Investigations) DEN3 Kwai Chung Reclamation (Consulting Engineers)

63/2

63/2

60/3

58/3

DEN4 Kwai Chung North Development, Area 9, Stage I

62/NOV

DEN5 Kwai Chung North Development, Area 9, Stage II

63/2

DEN6 Sha Tin Bridge

63/1

DEN7 Sha Tin Development, Investigation

62/3

DEN8 Tai Po Market Central Area, Roads and Drains (Consulting Engineers) *DEN9 Tsuen Wan Reclamation, Stage I

63/AUG

57/3

DEN10 Tsing Yi Island Development, Investigations

64/3

64/1

DEN11 Castle Peak Development, Stage I (San Hui Scheme-Part)

64/3

63/2

* Completed Items

No.

*RH55

CIVIL ENGINEERING — CATEGORY D

HONG HONG ISLAND

ROADS AND BRIDGES

Project

Cape Collinson Road (Shek O Road to Crematorium Access Road)

RH56

Improvements to Connaught Road Central-Edinburgh Place to Pedder Street

RH57 Lower Albert Road/Ice House Street Junction

RH58

Stepped Access-Shu Kuk Street to Tin Hau Temple Road

*RH59

RH60

Footpath at Tai Hang Road between Blue Pool Road and Wong Nai Chung Gap Road Car Park near Tiger Balm Gardens, Tai Hang Road

RH61

Temporary On-street Bus Terminus, Shau Kei Wan

RH74 RH75

North Point Bus Terminus Extension

Surfacing of Kennedy Town New Reclamation

Date of Inclusion

63/2

63/3

61/1

63/1

63/1

63/3

63/3

64/2

64/2