No.
ROADS AND BRIDGES
Appendix IV-Contd.
CIVIL ENGINEERING
NEW TERRITORIES
Project
A
B
C
217
RN1
Lion Rock Tunnel
60/DEC
RN2
Road through Lion Rock Tunnel
64/1
62/FEB
RN3
Sha Tin Tunnel Approach Road-North Portal to Sha Tin
63/3
62/1
RN4
Castle Peak Road, Dual Carriageway, Stage II (Lai Chi Kok Gap to
Motion Picture Studio)
61/3
59/3
RN5
Castle Peak Road Improvements (Chai Wan Kok)
60/1
RN6
RN7
Castle Peak Road, Dual Carriageway (Tsuen Wan to Castle Peak) Bridge at 231 M.S., Castle Peak Road
59/3
62/1
58/3
RN8
Hang Hau Road, Junk Bay
61/3
59/3
RN9
Hok Tau Valley Road, Tai Po
63/3
RN11
RN17
RN10 Dual Carriageway, Hung Shui Kiu
Kam Tin Road (through Kam Tin)
RN12 Kwun Tong/Ma Yau Tong/Junk Bay Road
†RN13 Lam Hau-Shan Ha Road, Yuen Long
RN14
Luk Keng-Tai Mei Tuk Road
RN15 Long Harbour Road, Sai Kung
RN16
Pat Heung Road System, Stage II
Pillar Point Road, Castle Peak, Stage I
RN18 Ping Shan-Yuen Long, Dual Carriageway
62/3
61/3
63/1
61/3
61/3
60/3
60/3
59/3
60/3
59/3
60/3
59/3
64/MAY
59/3
61/3
60/3
59/3
RN19
Route I Improvements, Stage II (TWSK—Tai Po Road)
61/2
60/1
RN20 Railway Crossing at Sha Tin-Widening of Road and Installation of
61/2
Traffic Signals
RN21 Sha Tin-Siu Lek Yuen Road
61/3
59/3
RN22 Sai Kung-Tai Mong Tsai Feeder Road Widening, Stage I (Sai Kung to
Tai Wan)
62/3
61/2
RN23
Sai Kung-Tai Mong Tsai Feeder Road Widening, Stage II-Tai Wan to
Tai Mong Tsai
61/2
RN24 Shap Pat Heung Feeder Road Widening, Stage I-Yuen Long Main Road
to Kwong Ming School
62/1
61/3
59/3
RN25 Shap Pat Heung Feeder Road Widening, Stage II
59/3
RN26
Reconstruction of Humped Bailey Bridge (Bridge No. 51) at San Wai
(M.S. 2, Sha Tau Kok Road)
63/3
63/2
RN27 Shek Wu Hui, Roads and Drainage, Stage III
RN28 South Lantau Road Widening, Stage II (Cheung Sha to Shui Hau)
61/1
59/3
RN29
South Lantau Road, Stage III
63/3
61/3
RN30
Tai Au Mun/Tai Wan Tau/Clearwater Bay Beach Road
60/3
RN31
Tai Po-Ting Kok Feeder Road Widening
63/JAN 60/3
59/3
RN32
Tai Po Market Industrial Area, Roads and Drains
63/2
RN33
Tai Po Road-Reconstruction of Bridge No. 45 at 91 M.S.
63/1
61/3
RN34 Tai Wan-Ma On Shan Road
63/3
62/2
RN35
Tai Wai Roads and Drainage
61/1
60/3
58/3
RN36
Road from Tate's Cairn to Kowloon Peak
60/1
RN37
RN38
Texaco Road Improvements, Stage III (Cemetery Road to Seawall) Tin Sam-Ha Tsuen Road
64/1
60/3
60/1
RN39
Tsuen Wan (North) Roads and Drains
62/3
RN40 Tsuen Wan South, Roads and Drainage
61/1
RN41
Dual Carriageway-Yuen Long to Au Tau Kam Tin Road
61/3
RN42
Yuen Long Roads and Drains, Stage II
64/3
63/3
RN43
Yung Yuen Road, Ping Shan
59/3
RN44 Kwai Chung Bus Terminus
63/1
RN45 Tsuen Wan Bus Terminus
64/3
63/2
63/1
RN46 Yuen Long East Bus Terminus
63/2
RN50
Pillar Point Road, Castle Peak, Stage II
64/MAY
RN51
Kwai Chung Industrial Areas 27, 28 & 29 (part), Final Surfacing of Roads RN52 Road to Junk Bay, Stage I (Yau Tong Road to Sau Mau Ping)
64/2
64/3
RN53
Yuen Long Roads and Drains, Stage I
64/3
63/3
RN47
Lam Tei Road
64/3
RN54 Tung Chung Access Road Improvement, Lantau Island
64/3
† Deleted and incorporated in DN8
DRAINAGE
DN1
Kwai Chung Development, Roads and Drainage
61/3
DN2
DN3
DN4
Kwai Chung Development, Areas 17 and 29 (part), Drainage and Roads Kwai Chung Industrial Areas 27, 28 and 29 (part)-Drainage and Roads Yuen Long Flood Control, Stage I
63/1
61/3
61/1
59/3
60/3
DN5
Yuen Long Flood Control, Stage II
62/3
61/3
No comments yet.
Private notes are available after approval.